an abstract photo of a curved building with a blue sky in the background

Engineering Precision with BIM & Digital Delivery Expertise

Delivering high-performance infrastructure through coordinated modeling, 4D/5D planning, clash detection, and advanced digital workflows across multidisciplinary teams.

Trojena Dam Project – NEOM

As part of NEOM’s landmark water infrastructure development, I led BIM coordination, clash detection, and 4D simulations for the Trojena Dam. Integrated multi-discipline models and managed digital delivery, enabling accurate sequencing and real-time project insights across mountainous terrain.

👤 Role:

BIM Manager

🏢 Company:

Webuild S.p.A.

🛠️ Tools Used:

Navisworks, Synchro 4D, Civil 3D, Revit, Lumion, Autodesk Construction Cloud (ACC)

Trojena Lake and Dams Layout

Trojena Lake and Dams 3D View

Julius Nyerere Hydroelectric Power Plant (JNHP) – Tanzania

As part of a multidisciplinary team delivering Africa’s largest hydropower project, I led BIM coordination and digital execution for over 100 km² of terrain. The scope included model federation, clash detection, quantity take-offs, and 4D/5D simulations. I ensured accuracy across dam, power intake, tunnels, and switchyard zones while aligning with international standa

DAM and Powerhouse View from U/S Side
Powerhouse 3D Sectional View

👤 Role:

BIM Manager

🏢 Company:

Webuild S.p.A.

🛠️ Tools Used:

Navisworks, Synchro 4D, Civil 3D, Revit, Lumion, Autodesk Construction Cloud (ACC)

Julius Nyerere Hydroelectric Power Plant (JNHPP) – BIM Execution for Africa’s Largest Renewable Energy Project

As part of the multidisciplinary team delivering the iconic Julius Nyerere Hydroelectric Power Plant, I played a key role in the Building Information Modeling (BIM) execution of this national-scale infrastructure megaproject, valued at over $2.9 billion and delivering 2,115 MW of clean energy to Tanzania.

This complex project, spanning more than 100 km² of dam, powerhouse, tunnels, switchyards, and transmission corridors, required an advanced, collaborative, and data-rich digital environment. My BIM responsibilities were central to achieving design coordination, construction efficiency, and quality compliance.